One Friday, the builders decided that they were done, and just threw together 2 days worth of work in an afternoon.
It was a rushed job and it showed.
I had had enough!
And Why haven't we done something about fixing it?
In houses built when ours was, the Frame was built into the floor joists before the Timber Floorboards (in our case Tasmanian Oak) were attached.
When you remove walls there is a 90 mm gap between the rooms.
A Good Tradesman would source similar floorboards and repair the gap properly.
The scrap of Structaflor they used was basically thrown onto the bearers and only screwed down because it didn't lay flat. It was noticeably higher at one end and the door barely cleared it without the carpet.
Which apparently involved drilling a LOT of holes, and then hitting it with a hammer.
(OK - Point of no return!)
When that was removed we discovered WHY it didn't lay flat.
One Joist was over a 1/4" higher than the others. And attached to that - was an electrical Junction box.
What would have been a 2 minute job for a Chippie with a sharp chisel took DH Half an Hour to fix.
Mainly because he couldn't find his Sharp Chisel and the need to be careful around that junction box.We did have pieces of Tasmanian Oak Floorboards (doesn't everyone keep offcut timber in the roof?).
And when we are out of lockdown I will line those linen shelves.
Now FINALLY the inside of the Cupboard is presentable and I found somewhere to keep the Step Ladder!